5. |
Construction Techniques Used |
: |
Trench excavations by machinery,
hand leveling and fine adjustment within the trenches,
bedding with material, laying concrete pipes, wrapping with
material and backfilling and conducting of the tests,
tarnsportation of pipes, laying of (Ø600- Ø800- Ø1000) mm
HDPE sewage pipes by electrofusion,
. Installation of building entry service lines and mounting
and testing of service regulators |